Triad High School

Total Savings:

33%
Electricity Savings (kWh): 891,095 34%
Natural Gas Savings (Therms): 18,006 28%
Overall Energy Savings (Mbtu): 4,841 32%
Utility Cost Savings ($): $79,383 33%
Estimated Project Cost ($): $239,640 3.02 yrs. (Payback)
Available Utility Incentives($): $91,385 38% of Proj. Cost
Net Cost w/Incentives ($): $148,255 1.87 yrs. (Payback)

Date Completed: May 2013
Client: Triad Community Unit School District #2
Size: 224,500 sq. ft.
Type of Construction: Existing
Service: Retrocommissioning, Energy Audit
Facility Type: Education K-12

Triad High School, located in Troy, Illinois, is a large facility with an athletic wing housing two gymnasiums and related support areas, an office/commons central location with cafeteria/commons space, library, and administrative offices, and a classroom wing of two levels. This project included individual fan coil units for the classrooms with energy recovery units to provide tempered outside air ventilation. A solution to a long-term problem with classroom comfort issues was identified as part of this project with a very low cost fix.